Free Webinar: Learn proven strategies to achieve Class A and Class B EMI compliance in high-voltage, high-current battery systems — without oversizing or overbudgeting.
Battery Energy Storage Systems (BESS) are a cornerstone of clean energy integration, but high-voltage, high-current designs can create severe electromagnetic interference (EMI) issues. These challenges not only risk compliance failures but can also limit your market reach, especially when targeting both industrial and residential deployments.
In this on-demand webinar, Anand Awasthi, Director of Product Marketing for Astrodyne TDI’s EMI Filters Business Unit, walks you through real-world BESS EMI problem-solving. You’ll see how an iterative design approach reduced EMI emissions by up to 60 dB, enabling systems to meet Class B limits without excessive component cost or footprint.
Key EMI sources in AC- and DC-coupled BESS architectures.
How voltage and current ratings influence filter design.
When to use standard vs. custom EMI filters.
Layout, shielding, and distributed filtering strategies for maximum noise reduction.
How to integrate EMI compliance into your product design cycle for faster time to market.
Watch the webinar now and learn how to move from failure to full EMI compliance — and how Astrodyne TDI can be your partner in delivering power, EMI filtering, and transformer solutions for clean energy storage.